AER's IAR back in business
The IAR is back up after 6 days of down time.
The Alberta Energy Regulator's website called the Integrated Application Registry came back up yesterday evening (May 27) before 8 pm. It had been down for 6 days.
During that time, no applications were approved by the regulator. Also no orders for past application documents were filled.
Because of the large backlog in the AER's application order department, time to fill applications is now over 30 days.
During the outage, AppIntel, Regaware's application website was still up and functioning properly. AppIntel subscribers were still able to get applications on demand from AppIntel.
?subject=Sign me up for an AppIntel subscription&body=Sign me up for an AppIntel subscription so I can still access application intelligence even when the IAR is down%0D%0A%0D%0AMy name _________%0D%0AMy phone number _________%0D%0A%0D%0A(Or, if your need is urgent, call AppIntel Sales at 403 803 2500)">Contact us about an AppIntel subscription.
Tags: AER application, Closure
Granger Low 27 May 2015

Six ways to unlock the secrets of high recovery polymer
Why it doesn’t always work and what to do about it

High VRR overrated?
Quotes five SPE papers

Better views than from a drone
Watch and copy the successes of others

Polymer: Here are the dividends of collective genius
The wisdom of the many outweighs the assumptions of the few




Calgary, Alberta, Canada
Share