Forecast approval time for your application
Better than a crystal ball, AppIntel helps you forecast time line
What's the first thing you want to know when you are about to submit an application?
How long will it take to get approved.
Will it take a month, or a year?
How will it affect my drilling schedule?
Better than a crystal ball, AppIntel helps you forecast this important timeline.
Screen Shots:
Use the Month tab in AppIntel.
Set your desired month.
Select the Months to Issue report. (See below)

Click the Report action button.
| Months to Issue | |
|---|---|
| Application Type | Total |
| Alternative Storage | 0.8 |
| Cavern Storage | 1.4 |
| Class I Disp: Amend | 2.2 |
| Comm Amend Category2 | 3.7 |
| CW CBM Press&Flow | 0.1 |
| Disp Scheme: Amend | 1.1 |
| Disp Scheme: New | 2 |
| ER Scheme | 1.1 |
| GOR Penalty Rlief | 0.9 |
| GPP | 1.9 |
| Prim Recovery: Amend | 1 |
| Spacing: Oil | 0.7 |
| Special MRL | 2.5 |
Each application type approved that month shows the average number of months for approval. Click the hyperlink to see all applications of that type approved.
Ensure You can Drill on Schedule!
Tags: AppIntel advantage, Scheduling
Granger Low 14 Jul 2015

Save the world by recycling produced brine
Saline water treatment

AppIntel AI: Work smarter, not harder
Those that can't see the value of a car should walk

4 ways to be smarter in an age of information overload
Stay relevant with the right information

Sulphur plant turndown
See his process flow diagrams

Saving SAGD OTSG from caustic failure
On the path to increasing water recycle rate

Every drop counts
Saving water while fracking

Save the world by recycling drilling fluids
Reuse as polymer hydrating solution

Alberta operators losing $13 billion per year from unoptimized floods
How much are you losing?




Calgary, Alberta, Canada
Share